Electrical Refurbishment

G&W Contracts were appointed the Principal Contractor and PSCS for the SDB Upgrades & Additional Circuits project in an undisclosed facility in 2024.
The project involved powering down sub-distribution boards throughout a live operational facility and installing additional RCBOs and MCBs to increase circuit capacity and future-proofing the boards. The shutdown, conducted over a weekend, was meticulously planned to ensure the facility was fully operational by Monday morning. We coordinated with various contractors to verify that all systems were restored and functional. New circuits were added to office workstations throughout the warehouse, with terminations and testing performed in the local SDBs. This work was executed with precision within a high-security, active operational environment.